Peeksellz / Insights

Studio

What a quote from us actually contains

No hour banks, no approximate ranges. These are the seven lines you get, and why each one is there.

Anna Lindqvist

2 Jul 2026

4 min read

A quote that says “around 80 hours” is not a price, it is an option on your budget. We write a fixed price per scope, and that requires the scope to be written clearly enough that both sides can hold to it.

The seven lines

  • What gets built, in pages and functions — not in adjectives.
  • What is explicitly not included. This line rescues more projects than any other.
  • A timeline with dates, and what we need from you to hold them.
  • The price. One number. It does not move unless the scope changes in writing.
  • Who does the work, by name.
  • What happens after launch, and what it costs per month.
  • What you own when we are done. The answer is everything.

If the price can move, you did not get a quote, you got a guess.

The quote arrives within 48 hours of the discovery call. If the scope is unclear we say so, rather than putting a number on it we cannot stand behind.